Asbestos and Demolition


Asbestos and Demolition


Framework Ref:

ASBESTOS & DEMOLITION


Start Date:

June 2017


End Date:

June 2025


OJEU Contract Notice:

Click Here


OJEU Award Notice:

Click Here


Asbestos and Demolition Contractors

Overview

The framework has been designed to give Landlords flexibility to fulfil their individual and specific asbestos and / or demolition requirements via the four asbestos and two demolition lots detailed below:

  • Asbestos surveying
  • Asbestos Air Monitoring
  • Licenced and Unlicensed Domestic and Civic Asbestos Removal
  • Unlicensed Domestic and Civic Asbestos Removal
  • Low rise demolition works (<4 storeys)
  • Highrise demolition works (>5 storeys)

The framework is predominantly focused on the delivery of work to social housing properties in Yorkshire and the Humber but may extend to other public buildings such as schools and offices and other areas of the UK.

Call Off Mechanism

There are 2 call off routes under the Framework, these are:

Direct Selection:

This is a simple mechanism that allows you to select the Contractors on the relevant lot without having to undertake a separate tender based on the framework rates to determine the most economically advantageous offer for your requirements, subject to capability/capacity assessment. This method is most suitable for works that are similar to that described in the overall framework at tender.

Mini Competition:

Where all Eligible contractors capable of carrying out the work from the relevant lot are invited to tender. The ITT will set out the criteria to be used to determine the most economically advantageous tender detailing the questions, scoring mechanism, weighting and timescale. Once the Contractors have priced the works and submitted the required answers to the quality question, EN can analyse the submissions and produce an award recommendation report for the Client to review/accept.

Apprentice Requirements

Framework contractors are required to provide at least 1 full time training opportunities per £500000 awarded through the framework.

Framework Contact

Carl Bairstow

Contact

Related frameworks


20 Feb 2024

Installation Servicing Repairs & Maintenance


4th generation framework for planned and responsive installation, servicing, repairs and maintenance works

Find out more
6 Dec 2021

Installation, Servicing, Maintenance and Repair Works


Find out more
9 Apr 2021

DPS For Energy Efficiency Retrofit Installation Contractors


Find out more
29 Nov 2019

DPS for Installation, Responsive Repair and Maintenance


Find out more